I have a question along these same lines. Is it better, if time is limited, to do one step on the entire project (ie cutting it in or beveling) per session? An example would be such as one a belt, i have done it where the entire belt was wrapped in saran and i stamped my way down it, unwrapping as i went. I have also done it where i cut the entire design in, then beveled the entire belt, and so on and so forth. I guess my thought would be that as someone who is probably not as consistant from day to day, a person would be able to tell the start and stop points.