Rawhide Report post Posted April 26, 2008 How long do you let Resolene dry between coats? I am using a 50/50 mix with water and a preval sprayer. Also, do you buff it? If so, buff between coats or after final coat? Thanks, marlon Quote Share this post Link to post Share on other sites
freak Report post Posted April 27, 2008 I've never reduced it but after ever use i swear i'm going to next time. argggg!!! I"ve always buffed in between coats. Am i doing it rite, heck i have no idea. I hope someone with experience chimes in here as i 'de like to know as well. Quote Share this post Link to post Share on other sites
Rawhide Report post Posted April 27, 2008 Thanks Freak, How long do you let it dry? To touch, or overnight? M Quote Share this post Link to post Share on other sites
Regis Report post Posted April 27, 2008 Marlon, I use 50/50 but don't spray(yet). I wait until completely dry to the touch....less than an hour for sure. Buff & then 2nd coat. Surely there are much more experienced folks to answer cuz, I've probably only used it 15-20 times so far. Regis Quote Share this post Link to post Share on other sites
Srigs Report post Posted April 30, 2008 I do a 50/50 cut of Resolene/water. I dip my rigs and then let it drip down and clean up any extra. Stick it in front of a fan overnight up to 12 hours and I don't buff. Quote Share this post Link to post Share on other sites
khemo Report post Posted April 23, 2015 So, it takes Resolene somewhere between 1 hour and 12 hours to dry? 12 hours if dipped. 1 hour if...painted or sponged on? Quote Share this post Link to post Share on other sites